A second storey, carried out over the patio
More room without giving up the yard. The new floor is carried on posts over the existing patio, framed and sheathed, then roofed and sided to tie into the house.
What was done
The work, in order
- Posts and beams set to carry the new floor
- Walls framed and structurally sheathed
- Rough electrical run before the walls closed
- Rigid insulation over the sheathing
- Roof framed, decked and shingled into the existing roofline
- Siding matched to the existing courses
Photos
Before and after
Before and during

Framed and sheathed, up on its posts. 
Studs, joists and rough wiring. 
The new subfloor and stud walls. 
The framed bath, plumbing roughed in. 
Rigid insulation before the siding.
After

The finished addition. 
New siding meeting the old wall. 
The roof tied into the original. 
Roof and gable from above.